We have three prospective lithium projects in the lithium triangle in Chile, a leading centre for battery-grade lithium production.
Projects include Laguna Verde and Viento Andino, located c.300km by road from the mining centre of Copiapó in the Atacama region of Chile. The Company also holds licences for a project called Arenas Blancas, which covers a total area of 377 km2 and is located on the periphery of Salar de Atacama where the some of highest concentrations of lithium are found.
Flagship Project
Laguna Verde
Has a JORC compliant resource estimate of 1.9 million tonnes LCE at 174mg/L Li.
The results of the Pre-Feasibility Study were announced on 31st March 2026. There is potential for a multi-decade commercial production and the project is well located by existing power and transport infrastructure. See project page for more information.



