We have secured promising mining properties located in the southern part of the Salar de Antofalla, a major salar in Argentina which is only 80km from CTL’s flagship project, Laguna Verde. While the focus remains on progressing the advanced Laguna Verde Project, the addition of this project enhances CTL’s district scale exploration and development strategy.
The Option Agreements are directly adjacent to an exploration project held by Albemarle in the southern section of the salar. Albemarle´s project, as reported in their 2025 annual report SEC filing has a total resource estimate of 1.79 million tonnes of lithium which corresponds to 9.5 million tonnes LCE, including a Measured and Indicated resource of 4.8 million tonnes of LCE and corresponding lithium grade of 406 mg/L
Salar de Antofalla is located within 80 km of Laguna Verde, with existing and planned roads in the region connecting the project to the San Francisco border crossing, where a paved international highway intersects the Laguna Verde Project immediately to the west and passes through to the mining centre of Copiapó and coastal ports. This provides strong potential synergies for development with the Laguna Verde and Viento Andino projects.
From the Laguna Verde Project
Adjacent Albemarle project resource
with a M&I grade of
(Albemarle, 2025 SEC filing)


Salar de Antofalla is located in Catamarca Province, Argentina, at an altitude of approximately 3,350 m and is accessible by existing roads. Catamarca Province has an active lithium production and development sector. This includes the Fenix Project, held by Rio Tinto, that has been in production since 1997, and new production bases at the Sal de Vida Project (Rio Tinto) and Tres Quebradas (Zijin Mining).
Vertical electrical sounding (VES) geophysics was completed on the Genoveva property by the current owner, as shown in Figure 3. Of the two lines completed, the east-west profile of Line 1 is shown in Figure 4, indicating a highly conductive (low resistivity) zone from near surface to the depth extent of the profile at 600 m, providing a vertically and horizontally extensive brine exploration target in that licence area. As an adjacent area to a major established resource, CTL´s technical team considers that the licences have good potential, justifying further exploration.


Next steps
The Company intends to undertake a resource evaluation programme at the properties at some point in 2027, subject to available funding estimated cost approximately US$500,000 with the aim of establishing a maiden JORC-compliant resource estimate as a first milestone.